On the morning of June 4, 2024, our company's technical backbone personnel flew back to China from Thailand and held a technical briefing meeting in the conference room of Anji Changhong Chain Manufacturing Co., Ltd. on the new factory project of AC Industry (Thailand) Co., Ltd. Our personnel reported to the owner on the local design specifications, conventional construction methods, and problems in the drawings in Thailand. We had in-depth exchanges with the owner's attendees, saving investment funds for the owner.
On the afternoon of June 4, 2024, in the conference room of Zhejiang Tianchen Design Institute, relevant designers and owners of the institute sorted out the on-site pile testing situation and areas that needed improvement in the drawings, and determined the best construction plan for each detail, providing guarantees for smooth construction in the future.
The convening of this technical briefing has strengthened the communication and connection between the owner, designer, and contractor, clarified the design ideas, clarified the construction nodes, and laid a solid foundation for the smooth construction of the project.